      The joint venture "SHARQTEHENERGOTA'MIR" was established by a joint decision of the management of JSC "Leningrad Metal Plant" and the Ministry of Energy of the Republic of Uzbekistan in 1995 to carry out work on repair of turbine equipment Power stations of the power system.

JV "SHARQTEHENERGOTA'MIR" is a member of JSC "UZBEKENERGO".

      The enterprise performs a complex of works on modernization, installation, repair, adjustment and servicing of the main and auxiliary turbine and boiler equipment of manufactories, electrical equipment of workshops and distribution devices with a voltage of 6-500 kV, ACS (automatic control system), technological protection and signaling at power stations of the Uzbek energy system and enterprises of other industries of the Republic of Uzbekistan.

      The enterprise supplies power equipment, components and spare parts with associated services for their installation and commissioning.

      In the period of formation, the main task of the enterprise was to provide repair of 300 MW power blocks turbine equipment of production of the Leningrad Metallurgical Plant OJSC at the largest power plant in Central Asia - Sirdaryo TPP with a capacity of 3000 MW.

      In a short time, the company proved itself as a reliable business partner in the energy system, with experience of trouble-free operation and high qualification personnel, what allowed it to take part in large-scale projects.

      In the period from 2001 to 2003, the company participated in the modernization of the power units of the st. No. 7, 8 of the Sirdaryo Thermal Power Plant.

      Having made a significant contribution to the modernization of the turbo-units of both power units, the enterprise gained invaluable experience with the newest technologies and equipment in the installation, repair and setup of turbine equipment.

      In the period from 2014 to 2015, the company participated in the modernization of the power units of the st. No. 1, 2 of the Sirdaryo Thermal Power Plant carried out by OJSC “Power Machines”.

      Under the technical direction of the specialists of the OJSC "Power Machines" it were performed the works on modernization and reconstruction of turbines of the K-300-240 type of both power units, including: replacement of rotors of turbine units, replacement of details of the flowing part, replacement of cylinders internal cases, replacement of seals, replacement of bearings, it was installed a system of hydraulic lifting of bearings, as well as works on modernization and reconstruction of a turbogenerator like hydrogen-water-cooled turbogenerators (HWCT) - 320-2, includ-ing: replacement of stator rods and generators winding of two power units.

      As a result of the conducted modernization, the capacity of power units has been increased to 325 MW, as well as reliability and reduction of specific fuel consumption, extension of the service life of power units by more than 20 years.

      At the time of the enterprise formation, the number of JV "SHARQTEHENERGOTA'MIR" did not exceed 70 people. Today, the company employs more than 270 people.

      Since 1996, the enterprise has created production sites based on the largest power plants of the Uzbek power system.

      Register of performed works and services of JV «SHARQTEHENERGOTA”MIR»

  • Repair of steam turbines К-800-240
  • Repair of steam turbines К-300-240-3
  • Repair of steam turbines К-300-240
  • Repair of steam turbines К-200-130
  • Repair of steam turbines К-100-90
  • Repair of generators hydrogen-water-cooled turbo-generators – 800-2, 320-2
  • Repair of generators hydrogen-cooled synchronous turbogenerators -120-2
  • Repair of power electric motors
  • Repair of power transformers
  • Repair of pumping equipment
  • Repair of power fans
  • Repair and setup of ACS (automatic control system)
  • Repair of measuring instruments
  • Repair of electrical equipment of 0,4-6kV switch-gear
  • Repair of electrical equipment of 220/500 open switchgear
  • Repair of high pressure fittings
  • Repair of pipelines and vessels working under pressure
  • Setup of control systems for steam turbines and valves
  • Supply of equipment and spare parts for power equipment

      In 2015-2016 the company manufactured and supplied various types of anchor supports for newly commissioned high-voltage power lines such as: “Hachirchi-kuksarai”, “Karatau-Mangit”, “Angren-Pap”.

      All works performed by the company have permissions, licenses issued by the authorities of technical supervision and standardization.